Marriott Courtyard | HVAC Commissioning | Water Treatment

Marriott Courtyard | HVAC Commissioning | Water Treatment

Service: HVAC Commissioning & Water Treatment

Project: Marriott Courtyard Hotel, Edinburgh

Client: Polcom Modular

Cleartech Group Ltd were engaged by Polcom Modular to carry out HVAC commissioning and water treatment at the new Marriott Courtyard Hotel in Edinburgh. The hotel, which is located on Heriot Watt University campus, is situated next to the Oriam, Scotland’s sports performance centre. The hotel itself is centred around sport and hosts amenities such as; synthetic pitches, 12-court sports hall, five outdoor grass football pitches and two grass rugby pitches, as well as, eight squash courts, two exercise studios and a four-court sports hall. The top floor of the four-storey building is aimed specifically at teams of sportsmen and women and includes large twin rooms, private meeting spaces and specialised treatment ares for physio and rehab. Other hotel facilities include an open plan restaurant, bar, marketplace and informal lounge area.

The hotel was built using a technique which consists of slotting seperate module rooms together – all of which were shipped from Poland, ready-made with decorations and furniture intact inside. Cleartech are proud to play a part in this innovative build, along with new clients, Polcom.

Project Overview

Scope of Works:

  • Domestic Water Services Chlorination
  • Potable Water Samples Taken and Tested at UKAS Lab
  • Water Sample Analysis
  • Chemical Cleaning to BSRIA BG 29/2012
  • Water and Ventilation Balancing of Systems as Given in Client Enquiry
  • Commercial Building Air Test

 

Cleartech’s Approach

Our domestic water services chlorination include cleaning and chlorinating all associated installation hot and cold water services to BS8558. Our team of highly qualified engineers also took potable water samples from the systems, which were then taken and tested at a UKAS accredited laboratory – with results issued directly to the client.

Our scope of works also included carrying out a full pre-commission chemical clean, static flushing, dynamic flushing and dosing of corrosion inhibitor – all of which were conducted in accordance with BSRIA BG 29/2012 Pre-commissioning Cleaning of Pipework Systems. HVAC commissioning works included water and ventilation balancing of systems, as instructed by the client, and carried out as per C.I.B.S.E code ‘A’ and ‘W’.

Cleartech invest considerable time, effort and resources on building the expertise of our engineers and ensuring that all works are completed correctly and to the required specification.

HVAC Commissioning

 

 

 

 

 

 

 

For further information or advice on HVAC commissioning and water treatment, or for a quote, call today on 01698 682000, send an email to [email protected] or submit a contact form on our website.

Click the graphic below to view or download our Marriott Courtyard Hotel case study.

marriott

RELATED CASE STUDIES

Highland Council | Legionella Risk Assessments 

Highland Council | Legionella Risk Assessments  Client: Highland Council Contract Type: Legionella Risk Assessments Scope: 96 sites across the Highland…

The Salvation Army | Legionella Compliance Partnership

Services: Water Treatment, Legionella Compliance Client: The Salvation Army Scope of Works: Legionella Risk Assessments Implementation of Compliance Action Plans…

Loganair Site | Legionella Compliance | Water Treatment

Services: Water Treatment and Legionella Compliance Client: Loganair, Dyce, Scotland Scope of Works: Legionella Risk Assessment, Legionella Plumbing Remedials, and…

Get in Touch

Whatever your question is, or whatever your requirement is, we’re confident we can help – please don’t hesitate to give us a call or drop your enquiry via email.

Our aim is to always come back to you as soon as we can.

Tel: 01698 682000
[email protected]

Got a question?

About Us
Blogs
Services
Vacancies
Case Studies
Contact Us
[email protected]

HEAD OFFICE
Cleartech Group Ltd
Unit 9, Block 2, First Road
Blantyre Industrial Estate
Glasgow
G72 0ND

NORTH WEST OFFICE
ECB Water Solutions Ltd - Part of the Cleartech Group
5a Garswood Street,
Ashton-in-Makerfield, Wigan,
Lancashire,
WN4 9AF

NORTH EAST OFFICE
Cleartech Group Limited
Unit 4A
Spire Road
Glover Industrial Estate
Washington
Tyne And Wear
NE37 3ES

Copyright © 2025 Cleartech

Site by fatBuzz.

Cookies
Terms & Conditions